- Reconfiguration of existing intelligent lighting control system to meet criteria of flexible environment with ambient lighting, task lighting.
- Installation of new Linea lighting to MCR and Broadcasting rooms, New suspended feature lights to meeting rooms and office areas using products from Hacel lighting.
- New dedicated power circuits for kitchen/tea point area.
- New power supplies for Mechanical equipment, Fan coils roof condenser units via new distribution panel.
- New under floor power track system wired throughout production offices using products from Eaton terminated via floor grommets and floor boxes.
- Power track sub main circuits split between general distribution boards and critical sub boards protected by generator backing.
- Suspended trunking system from with led Lighting throughout using room occupancy sensors and switch banks.
- 130 Dedicated power supplies split between ups and generated backed distribution boards terminated at high level into commando outlets.
- Under floor main earthing system with tap off providing dedicated earth points to each of the 64 patch cabinets.
- New 400-amp sub main circuit wired back 6 floors to the main LV switch room via dual submain armoured cables with ancillary tray work.
- Installation of 6 no 3 phase distribution Boards split between dedicated power, Ups Power and generator backed power.
- New MCCB panel boards, Changeover switches and ATS Linked to existing generators all from the use of Eaton Products.
Project finished within allocated time,
No production time Lost,