Garret Lane Phase 2A/Medical centre

Location

Wandsworth SW18

Project length

7 weeks

Project overview

We recently completed a Building Management System (BMS) installation for a new medical centre currently under construction on Garrett Lane in Wandsworth. The project included the installation of two new air handling units (AHUs) located four floors up on the roof, as well as the development of a new plant room on the ground floor, where the main control panel is housed. A complete primary and secondary containment system was installed, running from the ground floor up to the rooftop — with cable runs exceeding 90 meters in length. Additionally, we installed all power supplies within the plant room, along with two 50kW heater battery supplies routed to the rooftop to support the AHUs. The project was completed successfully, despite two significant challenges. The first was the tight deadline, which we managed by bringing in additional engineers to ensure all work was completed on time. The second challenge involved routing our cabling through the risers. With the AHU ductwork and other building services also occupying the risers, there was considerably less space available than initially anticipated. To overcome this, we extended the cable route to a secondary riser and implemented a double-stacked containment system, which effectively reduced our overall footprint within the limited space The client on site did recognise the extra effort and did report back how happy he was with the conduct and quality of the workmanship throughout the project by our team which is all I need to hear and the most important feedback.

Works involved

  • Installation of all BMS points located in the reception area, plant room and on the roof.
  • 90 metres of Separate Primary and secondary containment from ground floor to the roof for the power supplies and BMS (ELV) cabling.
  • Power supplies run in armoured cable to the roof plant room and reception area with local rotary isolators at each location.
  • Offloading and installation of 2.4m wide BMS panel with header trunking.

More case studies

Lavender medical

Founded in 2009, Lavender Medical specialises in the supply and distribution of osteosynthesis products to the orthopaedic community. Since its establishment, the company has experienced consistent gr...

Gravity Media

Gravity media is a global media production, creative service and facilities company. They deliver world class broadcasting solutions of any size at any time. They cover some of the world’s larges...

Zund

ZÜND are a rapidly growing company here in the Uk with technical advances in the making of large-scale cutting machines. We were given the exciting opportunity to help them expand the company with the...

A Hoppy Place

This family run craft beer brewery went for an Industrial open ceiling look which has become very popular in recent years. This look suited the brewery perfectly and allowed our engineers to show off ...

Christie and Co

Christie & Co are specialists in business advisory when it comes to buying and selling in many various sectors of industries. This structural shell of a building was transformed into a modern office a...

Brogan group

Brogan group is an international specialist in scaffolding and access equipment. The design for this project across two floors included a new reception area, state of the art board room, large open pl...

Active Ops

The Active Ops project was designed for a contemporary open plan layout to house 30 staff. It included training rooms, quiet rooms, library, hot desk and a large breakout area with meeting room opport...

get in touch

PHONE
01322 552888
EMAIL
office@oaktree-electrical.co.uk
ADDRESS
Oaktree Electrical Ltd
Unit 13a Hill Park Farm
Wrotham Hill Road
Wrotham
Kent
TN15 7QA

ACCREDITATIONS

smas
citation
niceic
chas
avetta
constructionline
© 2024 Oaktree Electrical. All rights reserved
Terms and conditions Privacy and cookie policy